Current State
Architecture v2 documentation baseline established; implementation status is being reclassified by evidence and gated before new redesign work.
Architecture v2 documentation baseline: Before new implementation, read
web/engineering/architecture-v2/README.md. Phase-level completion statements remain subject to the new status ledger; local implementation presence is not production acceptance.
Snapshot
Stable Phase 0 — Foundation: complete Stable Phase 1 — Core Platform: complete Stable Phase 1.5 — Public Web Product: complete Stable Phase 2 — Single Provider: complete Stable Phase 2.5 — Provider Generalization: complete Stable Phase 3 — Core Memory Substrate: complete Beta Phase 3.5 — Extraction & Context Assembly: under evidence review; provisional until the Architecture v2 ledger and linked exit evidence are reconciled Beta Phase 4 — Operator Platform & Multi-Provider: roadmap redesigned; Track P is the current prerequisite New Phase 4.5 — Intelligence Layer: planned New Phase 5 — Advanced Retrieval & Graph Memory: planned
Last updated: 2026-10-06
Branch: main at 393c8b7 (current public implementation baseline)
Current focus: Issue #935: proposed Architecture v2 G0 documentation and contract freeze before new implementation
Completed (recent): 3.5.F.3 Phase 3.5 exit audit; 3.5.F.2 ISO-MCP matrix; 3.5.F.1 learning-loop e2e; 4.C.5 streaming hardening baseline; 4.D.1 metadata overview (fc8735c); 4.D.2 metadata trace read slice (e4525e3)
Gap register and sign-off — zero open P0 gaps.
ADR register 0038 / 0050 / 0062–0072.
Track P readiness, redesigned Track D capabilities, and release gates.
Evidence, tenancy, privacy, query, control, and release contracts.
Accepted ADRs through ADR-0082; verify source and status before relying on a proposal.
Live phase cards and milestone progress.
Shipped Since Last Update
- Phase 3.5 Track F 3.5.F.3: Benchmark sign-off + ADR index — gap register, summary
- Phase 3.5 Track F 3.5.F.2: Cross-tenant ISO-MCP isolation matrix (#759)
- Phase 3.5 Track F 3.5.F.1: Learning-loop e2e —
make e2e-smoke-p3.5(#752) - Phase 3 Track E 3.E.5: Phase 3 exit audit — gap register, summary
What Ships Today
Next
- Accept the Architecture v2 G0 documentation and contract freeze tracked by #935: status ledger, authority matrix, contract registry, trust labels, and failure matrix.
- Resolve P0 gaps before new service boundaries, provider adapters, write-capable tools, budget changes, or model integration.
- Reclassify phase claims using source, test, benchmark, deployment-profile, and recovery evidence; then sequence G1–G11.
Last updated on